Our work
Scroll to turn the room
Click the folder to open the archive
01 / 09March 2026
Cut, fitted and welded in-house — columns, rafters and bracing delivered bolt-ready to site.

March 2026
Structural frame package
Cut, fitted and welded in-house — columns, rafters and bracing delivered bolt-ready to site.

January 2026
High-volume laser nesting run
Hundreds of brackets nested tight and cut on the 12 kW bed — consistent edges, minimal scrap.

November 2025
Architectural profiles, powder coated
Three-stage pre-treatment and an oven-cured RAL finish on long exterior profiles.

September 2025
Precision enclosure panels
Thin-gauge panels formed on the CNC brakes — every angle to the degree, every panel a twin.

July 2025
Drilled beam connections
I-beams coped, drilled and match-marked — assembled on site without a single field fix.

May 2025
Custom anchor bolt batch
J-bolts and studs to drawing, M24 class 8.8 — threaded, galvanised and bundled per base plate.

March 2025
Deadline weekend, night shift
A structural package finished over one weekend — the shop ran while the city slept.

January 2025
Stainless assembly, laser welded
Visible seams on brushed stainless — laser welded clean enough to skip the grinder.

October 2024
Measured before dispatch
Every batch checked against the drawing before the truck comes — paper trail included.
Your project could be next
Message us on WhatsApp